ATOMFAIR AF3300A PEROVSKITE FILM COATER WIRE BAR BLADE GLOVEBOX HEATINGRESEARCH GRADE EQUIPMENT
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
TAILORED SOLUTIONS FOR RESEARCH
Contact our engineering team for technical support or official quotations.
EMAIL: inquiry@atomfair.com
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Manufacturer: Atomfair LLC
Brand: ATOMFAIR®
|
Constraints for installing and operating the AF3300A perovskite film coater inside a glovebox. It requires external vacuum pump connection and nitrogen supply for inert atmosphere drying.
- Glovebox integration constraint: Verify antechamber clearance before transferring the coater into the glovebox.
- External vacuum pump connection: Connect the vacuum pump externally, as the pump requires an external connection before operation.
- Inert atmosphere drying: Connect the air knife assembly to a nitrogen supply when drying air-sensitive perovskite films.
- Wire bar selection: Select the wire bar based on target wet film thickness, because bar number determines the resulting coating thickness.
- Blade maintenance: Clean the flip-cover blade thoroughly after each use to prevent cross-contamination between materials.
Procedural steps for preparing and safely operating the AF3300A perovskite film coater under glovebox conditions. The workflow covers installation checks, inert gas connection, material selection, and post-use cleaning.
Required Equipment: Vacuum pump, Air knife assembly, Wire bar, Flip-cover blade head
- Check antechamber clearance
Inspect the glovebox antechamber to verify sufficient clearance for the coater before transferring it inside. - Connect external vacuum pump
Connect the vacuum pump externally to the system before operating the coating platform. - Connect nitrogen supply
Connect the air knife assembly to a nitrogen supply when drying air-sensitive perovskite films inside the glovebox. - Select wire bar
Select a wire bar whose bar number matches the target wet film thickness before starting the coating process. - Clean blade after use
Clean the flip-cover blade thoroughly after each use to prevent material cross-contamination. - Review user manual
Consult the user manual for installation, operation, and maintenance guidance before first use.
How do wire bar and blade coating compare on the AF3300A for controlling perovskite wet film thickness?
The AF3300A combines both methods: wire bar coating holds ±0.001 mm precision using high-precision imported bars, while blade coating provides a 0.1–10 mm thickness range at ±0.003 mm precision with a 200 mm wide mold-steel blade. Wire bar thickness is selected by bar number to match the target wet film thickness, and the snap-fit bar design reduces wear and simplifies changeover. For thicker, adjustable wet films the flip-cover blade head is the appropriate choice, but it should be cleaned after each use to avoid cross-contamination.
Can the AF3300A be integrated into a glovebox for inert-atmosphere perovskite film drying?
Yes, the AF3300A is specifically designed for glovebox thin-film deposition and coating. Its 550 × 210 × 340 mm footprint requires adequate antechamber clearance, and the vacuum pump is external. The integrated air knife can be connected to nitrogen supply for inert-atmosphere drying, with a standard outlet gap of 0.05–0.08 mm and 0.01 mm precision.
What power and vacuum infrastructure does the AF3300A require before installation?
The AF3300A operates on 100V–220V/50–60 Hz power at 1800 W, and the included vacuum pump draws 180 W while delivering 5.4 m³/h with a 2 Pa ultimate vacuum. The vacuum pump requires external connection, so installation planning must account for pump placement and external connection. The heating system is mica-sheet based (RT–180°C, ±1°C uniformity) and is controlled from the color LCD touch screen.
The ATOMFAIR AF3300A Perovskite Film Coater integrates wire bar coating (±0.001 mm precision), blade coating (±0.003 mm precision), vacuum adsorption (200×300 mm), and heating (RT–180°C, ±1°C uniformity) into a glovebox-compatible platform, enabling complete perovskite film deposition and drying workflows under inert atmosphere.
Positive
- Four-in-one glovebox-compatible coating platform: Combines wire bar coating, blade coating, vacuum adsorption, and heating in a compact 550×210×340 mm footprint, allowing sequential film preparation steps without breaking inert atmosphere.
- Integrated air knife with 0.01 mm precision: Air knife with customisable outlet gap (0.05–0.08 mm standard, up to 3 mm) and 0.01 mm precision enables controlled drying of perovskite films under nitrogen, critical for uniform crystallisation.
Trade-offs
- Cleaning required after each blade coating: Flip-cover blade head must be thoroughly cleaned after each use to prevent material cross-contamination, adding time between experiments.
- Glovebox integration requires careful planning: Dimensions of 550×210×340 mm and the need for external vacuum pump connection and nitrogen supply for the air knife require adequate antechamber clearance and gas line setup.
Every advanced material, component, equipment, and instrument in our catalog is backed by rigorous testing. We maintain strict internal quality management frameworks and align with CE conformity metrics to deliver transparent, reproducible performance data via our public open-science repository.
To request raw batch performance data, submit formal vendor registration paperwork, or execute a fast-turnaround R&D manufacturing loop, contact us at inquiry@atomfair.com.
Item is dispatched under the Atomfair Shipping & Delivery Framework (Free worldwide shipping on orders over $59 USD excl. heavy equipment). Return is governed by the Atomfair Return & Refund Policy (7-day technical return window).