Description
98L Ultra-Low-Humidity (1%-10% RH) Dry CabinetsDry storage cabinet, ultra-low-humidity control
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
CONTROLLED DRY STORAGE SOLUTIONS
For volume selection, humidity grade confirmation or optional configuration, contact our engineering sales team.
EMAIL: inquiry@atomfair.com
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Supplier: Atomfair
Brand: ATOMFAIR®
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The cabinet requires stable power and level placement to maintain consistent humidity control. Door sealing and minimized ambient exposure are critical to prevent moisture ingress and ensure ultra-low humidity conditions.
- Transport Orientation: The cabinet must be transported upright with reinforced outer protection to prevent structural damage to the dehumidification system.
- Power Stability: Connect the cabinet to a stable power source to avoid interruptions that could reset the set-point or compromise humidity control.
- Door Sealing: Confirm the door sealing gasket is intact and the lockable handle is engaged to maintain an airtight environment during operation.
- Ultra-Low Humidity Validation: For ultra-low humidity settings (1%–10% RH), validate the storage process before formal production use to ensure the cabinet meets the required conditions.
- Optional Alarm and Nitrogen Purge: Consider installing an over-humidity alarm or nitrogen purge system when process risk is high to provide additional environmental safeguards.
Position the cabinet on a level surface and connect to stable power before setting the desired humidity. Verify door sealing and allow the cabinet to stabilize prior to storing moisture-sensitive materials.
Required Equipment: Atomfair AF-DC98C Dry Cabinet
- Transport and Position
Transport the cabinet upright with reinforced outer protection and place it on a level, stable surface away from direct sunlight or heat sources. - Level Placement and Sealing Check
Confirm the cabinet is level using a bubble level and inspect the door sealing gasket for any gaps or damage. - Connect Power and Verify Display
Connect the cabinet to a stable power outlet and verify that the LCD display shows current humidity, temperature, and operational status. - Set Humidity Set-Point
Set the desired humidity range (1%–10% RH) using the microcomputer control panel and confirm that the set-point is retained after power interruption. - Close and Secure Door
Close the tempered-glass door securely and engage the lockable handle to maintain an airtight seal during operation. - Stabilize Before Loading
Allow the cabinet to run for at least 30 minutes to reach the target humidity before placing moisture-sensitive materials inside. - Validate Ultra-Low Humidity Process
For ultra-low humidity applications, validate the storage process with a calibrated hygrometer and consider installing a nitrogen purge or over-humidity alarm for added safety.
How does the Honeywell sensor's ±3% RH accuracy and 0.3% annual drift affect the cabinet's ability to maintain the lower end of the 1%-10% RH range, and what are the implications for storing ultra-moisture-sensitive components?
The Honeywell sensor's ±3% RH accuracy means that at a set point of 1% RH, the actual humidity could be as high as 4% RH, which may exceed the tolerance for extreme-low-humidity applications. The 0.3% annual drift further degrades precision over time, potentially requiring recalibration or use of the optional nitrogen purge system for critical storage. For materials requiring consistent sub-3% RH, the extreme-low-humidity model (1%-3% RH) or additional monitoring is recommended.
Can the AF-DC98C dry cabinet be used for ESD-sensitive component storage without the optional anti-static coating, and what are the limitations?
The standard cabinet body is powder-coated steel, which does not provide electrostatic protection. For ESD-sensitive storage, the optional ESD-safe anti-static coating is required to comply with IEC 61340-5 handling requirements. Without this coating, stored components may be at risk of electrostatic discharge damage during access or handling.
What are the critical installation and operational requirements for the AF-DC98C to ensure consistent ultra-low-humidity performance?
The cabinet must be transported upright with reinforced outer protection and placed on a level surface to maintain door sealing integrity. After installation, confirm level placement, door sealing, shelf loading within capacity, and stable power before storing sensitive materials. The door should be kept closed during normal use to minimize ambient exposure, and for ultra-low humidity applications, validating the storage process before formal production use is advised.
The Atomfair AF-DC98C 98L dry cabinet provides ultra-low-humidity storage (1%-10% RH) using automatic electronic dehumidification and a Honeywell sensor, suitable for moisture-sensitive components. Its sealed construction and adjustable shelves support lab deployment, but careful handling and stable power are required for consistent performance.
Positive
- Consumable-free dehumidification: Automatic electronic dehumidification module eliminates the need for disposable desiccant consumables, reducing ongoing maintenance and operational costs.
- High-accuracy Honeywell sensor: Integrated Honeywell temperature and humidity sensor provides ±3% RH accuracy with 0.3% annual drift, enabling reliable long-term measurement for sensitive storage applications.
Trade-offs
- Power dependency for humidity control: The cabinet relies on continuous power for dehumidification; while set-point memory is retained after power interruption, humidity levels may rise until power is restored, requiring stable mains supply or backup considerations.
- Handling and installation constraints: The cabinet must be transported upright with reinforced outer protection, and after installation requires level placement, door sealing verification, and stable power before storing sensitive materials, adding setup complexity.
Every advanced material, component, equipment, and instrument in our catalog is backed by rigorous testing. We maintain strict internal quality management frameworks and align with CE conformity metrics to deliver transparent, reproducible performance data via our public open-science repository.
To request raw batch performance data, submit formal vendor registration paperwork, or execute a fast-turnaround R&D manufacturing loop, contact us at inquiry@atomfair.com.
Item is dispatched under the Atomfair Shipping & Delivery Framework (Free worldwide shipping on orders over $59 USD). Return is governed by the Atomfair Return & Refund Policy (7-day technical return window).





