Simple Constant Temperature and Humidity Chamber, 250 L
Research-grade laboratory product
|
|||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||
|
LABORATORY PROCUREMENT SUPPORT
For model selection, accessory matching, installation-space review, power-supply confirmation or configuration support, contact our technical sales team.
E-MAIL: inquiry@atomfair.com
|
|||||||||||||||||||||||||||||||||||||||||||||||||||
|
Supplier: Atomfair
Brand: ATOMFAIR®
|
This chamber requires a dedicated power supply of AC 220 V, 50 Hz and a working environment of +5 to 35°C. Continuous operation is not recommended for heavy high-humidity loads, and accessibility for maintenance must be maintained.
- Power Supply Constraint: The chamber must be connected to an AC 220 V, 50 Hz power supply delivering 700 W.
- Environmental Operating Range: The ambient working environment must be maintained between +5 and 35°C.
- Continuous Operation Limitation: Continuous operation schedules should not be less than 180 hours, but heavy high-humidity loads are not recommended for long uninterrupted runs.
- Installation Accessibility: Air inlets, test ports, shelving, drain areas, doors, and controller surfaces must remain accessible for cleaning and maintenance.
Begin by confirming the installation space and preparing the required power supply. Ensure the chamber remains upright during transport and use suitable lifting equipment for positioning.
Required Equipment: Suitable lifting equipment
- Confirm installation space
Confirm that the installation space accommodates the external dimensions of 750 x 900 x 1580 mm. - Prepare power supply
Prepare the specified AC 220 V, 50 Hz power supply with a 700 W capacity. - Unload and position chamber
Keep the packed chamber upright and use suitable lifting equipment during unloading and positioning. - Ensure accessibility
Ensure that air inlets, test ports, shelving, drain areas, doors, and controller surfaces are accessible for cleaning and maintenance.
Why is the temperature control range for the LHS-250SC chamber narrower when humidification is active (15–45°C) compared to dry operation (10–45°C)?
The lower temperature limit is raised to 15°C during humidification because the humidity control system requires a minimum temperature to maintain stable relative humidity levels between 60%RH and 85%RH. Without humidification, the chamber can operate down to 10°C. This trade-off is inherent to the basic humidity control architecture of this simple series, as specified in the technical data.
What continuous operation limitations should be considered for the LHS-250SC chamber under high-humidity conditions?
The LHS-250SC is recommended for continuous operation schedules of at least 180 hours under proper installation, but it is not recommended for long uninterrupted operation under heavy high-humidity load. The chamber is designed for routine humidity work and may experience performance degradation or reduced reliability if subjected to sustained high-humidity conditions beyond its intended duty cycle, as noted in the configuration guidance.
What are the electrical and environmental installation requirements for the LHS-250SC constant temperature and humidity chamber?
The chamber requires a 220 V, 50 Hz power supply with a 700 W input. The working environment must be between 5°C and 35°C. Installation space should accommodate the external dimensions of 750 x 900 x 1580 mm, with access to air inlets, test ports, and drain areas. The unit should be kept upright during transport and positioned using suitable lifting equipment, as stated in the handling instructions.
The Simple Constant Temperature and Humidity Chamber, 250 L (AF-LE-E-LHSM-0250-SC25) provides a basic humidity-controlled environment for routine culture and stability work, with a stainless-steel interior and imported compressor, but its wider humidity fluctuation band and recommended continuous operation limit of 180 hours under proper conditions constrain its use for extended high-humidity or precision applications.
Positive
- Stainless-steel interior with rounded corners: The mirror stainless-steel inner chamber with rounded corners and removable shelving facilitates cleaning and sample handling, supporting hygiene and long-duration laboratory use.
- Side test-port access for external validation: The side test-port allows external measurement and validation tasks during chamber operation, improving reliability for routine culture, stability work, and packaging tests.
Trade-offs
- Wider humidity fluctuation band: Humidity deviation is specified at +/-5%RH to 8%RH, which is broader than higher-grade families, limiting suitability for applications requiring tight humidity control.
- Limited continuous operation under high humidity: The chamber is not recommended for long uninterrupted operation under heavy high-humidity load, and continuous operation guidance is limited to not less than 180 hours under proper installation conditions, constraining extended experimental runs.
Every advanced material, component, equipment, and instrument in our catalog is backed by rigorous testing. We maintain strict internal quality management frameworks and align with CE conformity metrics to deliver transparent, reproducible performance data via our public open-science repository.
To request raw batch performance data, submit formal vendor registration paperwork, or execute a fast-turnaround R&D manufacturing loop, contact us at inquiry@atomfair.com.
Item is dispatched under the Atomfair Shipping & Delivery Framework (Free worldwide shipping on orders over $59 USD excl. heavy equipment). Return is governed by the Atomfair Return & Refund Policy (7-day technical return window).