|
Large-Diameter Vacuum Tube Furnace, 1100 °C
LABORATORY THERMAL PROCESSING EQUIPMENT
|
|||||||||||||||||||
|
|||||||||||||||||||
|
LABORATORY PROCUREMENT SUPPORT
For model selection, configuration matching, power supply confirmation or quotation review, contact our technical sales team.
E-MAIL: inquiry@atomfair.com
|
|||||||||||||||||||
|
Manufacturer: Atomfair LLC
Brand: ATOMFAIR®
|
This vacuum tube furnace operates at temperatures up to 1100°C and requires a compatible power supply of 12 kW at 208-240V. Proper gas/vacuum connections and thermal management are essential to prevent damage and ensure safe operation.
- Temperature Class Confirmation: Confirm the required temperature class to match the furnace's maximum operating temperature and avoid overheating.
- Tube Size and Configuration: Select the appropriate tube diameter and length to accommodate the sample and maintain uniform heating.
- Gas/Vacuum Package: Ensure the gas and vacuum system is compatible with the process gases and vacuum levels specified.
- Power Supply Verification: Verify that the electrical supply meets the 12 kW, 208-240V specification to prevent electrical failure.
- Accessory Compatibility: Use only accessories rated for high-temperature and vacuum conditions to maintain safety and performance.
This procedure covers the safe initialization and operation of the vacuum tube furnace for controlled heating, vacuum, or flowing-gas treatments. Follow these steps to set up the system, load samples, and execute the thermal process.
Required Equipment: Vacuum Tube Furnace, Vacuum Pump, Gas Supply System, Temperature Controller (NC Display Screen)
- Configure Connections
Confirm that the power supply, gas lines, and vacuum connections are properly rated and securely attached. - Load Sample
Load the sample into the quartz tube and seal the system with the appropriate end caps and fittings. - Establish Atmosphere
Evacuate the chamber with the vacuum pump or purge with the desired gas to reach the required operating atmosphere. - Set Temperature Program
Set the heating ramp rate, target temperature, and dwell time using the NC display screen. - Initiate Heating
Initiate the heating cycle and monitor the temperature and pressure readings throughout the process.
Can the TF-1100-08 large-diameter tube furnace be configured for large-area monolayer graphene growth?
Yes, the furnace's large outer quartz tube can accommodate an inner tube, specifically enabling big-area monolayer graphene growth tests. This configuration is supported by the furnace's precise temperature control and long constant temperature zone, making it suitable for advanced materials research including graphene, semiconductor, and carbon fiber applications.
What gas atmosphere and vacuum capabilities are available with the Atomfair TF-1100-08 tube furnace?
The furnace supports both vacuum and flowing-gas treatment, including controlled heating, annealing, and sintering under inert or reactive atmospheres. The specific gas/vacuum package is customizable and must be confirmed during quotation, along with tube size, heating-zone layout, and accessory configuration to match the intended process.
What electrical infrastructure is required to install the 12 kW TF-1100-08 vacuum tube furnace?
The furnace is rated at 12 kW and requires a 208–240 V power supply. Installers must verify local electrical capacity and confirm power supply compatibility during quotation. The equipment is shipped with protective inner materials and reinforced outer packaging for safe handling and storage.
This 1100°C large-diameter vacuum tube furnace delivers a 12KW heating system with a spacious quartz tube that supports inner tube configurations for big-area monolayer graphene growth, but necessitates pre-confirmation of temperature class, gas/vacuum package, and power supply before deployment.
Positive
- Large tube and long constant temperature zone: The furnace's big quartz tube and extended constant temperature area enable multi-sample sintering or medium-scale testing, improving throughput for batch thermal processing.
- Inner tube capability for graphene synthesis: The large outer quartz tube can accommodate an inner tube, allowing big-area monolayer graphene growth experiments under controlled atmosphere.
Trade-offs
- High power requirement: Rated at 12KW (208-240V), this furnace demands a dedicated high-current power supply, which may require electrical infrastructure upgrades in standard lab settings.
- Pre-configuration reliance: The furnace requires confirmation of temperature class, tube size, gas/vacuum package, and accessories before quotation, indicating a non-standard configuration process that may delay procurement.
Every advanced material, component, equipment, and instrument in our catalog is backed by rigorous testing. We maintain strict internal quality management frameworks and align with CE conformity metrics to deliver transparent, reproducible performance data via our public open-science repository.
To request raw batch performance data, submit formal vendor registration paperwork, or execute a fast-turnaround R&D manufacturing loop, contact us at inquiry@atomfair.com.
Item is dispatched under the Atomfair Shipping & Delivery Framework (Free worldwide shipping on orders over $59 USD excl. heavy equipment). Return is governed by the Atomfair Return & Refund Policy (7-day technical return window).






