Description
100kW 232kWh LFP Low-Temperature Liquid-Cooled C&I Energy Storage Cabinet | ATOMFAIRCOMMERCIAL GRADE PRODUCTION
|
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
|
TAILORED SOLUTIONS FOR RESEARCH
Contact our engineering team for technical support or official institutional quotations.
EMAIL: inquiry@atomfair.com
|
|||||||||||||||||||||||||||||||||||
|
Manufacturer: Atomfair LLC
Brand: ATOMFAIR®
|
This cabinet must be operated within an ambient temperature range of -35°C to 60°C and requires a properly functioning liquid cooling system with manufacturer-recommended coolant. Electrical connections must use compatible LFP charging equipment, and the unit must be regularly inspected for cooling system integrity and electrical connection tightness.
- Temperature Constraint: Operate the cabinet only within the specified ambient temperature range of -35°C to 60°C to prevent thermal runaway or performance degradation.
- Coolant Requirement: Ensure the liquid cooling system is filled with the recommended coolant and free of leaks to maintain proper thermal management.
- Electrical Compatibility: Connect only compatible LFP charging equipment to the cabinet to avoid electrical hazards and system damage.
- Inspection Protocol: Regularly inspect the cooling system and electrical connections for signs of wear, leakage, or loose contacts.
- Disposal Requirement: Dispose of the cabinet according to local regulations for large-format lithium-ion battery systems.
This procedure covers the initial inspection, coolant verification, electrical connection, and system startup for the cabinet. Follow these steps precisely to ensure safe operation and compliance with manufacturer guidelines.
Required Equipment: Compatible LFP charging equipment, Recommended coolant, Multimeter for voltage verification, Safety gloves and insulated tools
- Inspect Cabinet
Inspect the cabinet exterior for any visible damage, dents, or leaks before moving it to the installation site. - Verify Coolant System
Verify that the liquid cooling system is filled with the recommended coolant and that all hoses and connections are secure and leak-free. - Position and Level Cabinet
Position the cabinet on a level, vibration-free surface capable of supporting its 2.6-ton weight and ensure adequate clearance for ventilation. - Connect AC Output
Connect the AC output terminals to a 400 V electrical system using appropriately rated cables and connectors, ensuring correct phase orientation. - Set Operating Parameters
Set the operating voltage range to between 650 V and 949 V and configure the charge/discharge current limits to a maximum of 140 A. - Verify Ambient Temperature
Confirm that the ambient temperature is within the -35°C to 60°C range before energizing the system. - Energize and Monitor
Energize the system and monitor the initial startup for any abnormal alarms, temperature spikes, or coolant flow irregularities.
How does the liquid cooling system maintain battery performance at the upper and lower extremes of the -35°C to 60°C operating range?
The advanced liquid cooling system actively regulates battery temperature to sustain optimal electrochemical performance across the full -35°C to 60°C range. At low temperatures, the coolant circuit preheats the LFP cells to prevent lithium plating and capacity fade, while at high temperatures it efficiently dissipates heat from the 100 kW discharge load, keeping cells within safe thermal limits. This thermal management is critical for maintaining the rated 280 Ah capacity and 232 kWh total energy delivery under sustained high-load commercial and industrial operation.
Can this 832 V nominal system be directly integrated with existing 400 V AC commercial building infrastructure without an external transformer?
Yes, the cabinet includes an integrated AC-side output of 400 V (-15% to 15%), enabling direct connection to standard 400 V three-phase commercial and industrial distribution panels without requiring an external step-down transformer. The battery-side voltage range of 650–949 V is managed internally by the system's power conversion stage to produce the regulated 400 V AC output. This simplifies installation in facilities such as manufacturing plants, data centers, and office complexes where 400 V service is already available.
What are the specific coolant specifications and maintenance intervals required to prevent thermal runaway in this IP55-rated LFP cabinet?
The manufacturer recommends using only compatible LFP-grade coolant as specified in the product documentation, with regular inspection of the cooling system and electrical connections to ensure safe operation. The IP55 enclosure protects against dust ingress and low-pressure water jets, but the liquid cooling loop must be maintained free of leaks and blockages to prevent localized overheating that could compromise the intrinsic thermal stability of the LFP chemistry. Detailed coolant type and change intervals should be obtained from the ATOMFAIR engineering team for site-specific conditions.
The ATOMFAIR 100kW 232kWh LFP liquid-cooled storage cabinet delivers reliable high-capacity energy storage with a wide -35°C to 60°C operating range, but its 2.6-ton weight and mandatory liquid cooling maintenance impose installation and upkeep requirements.
Positive
- Wide Temperature Operation: Certified for -35°C to 60°C, this system enables stable C&I operation in extreme climates without additional thermal conditioning, reducing auxiliary power draw.
- LFP Safety and Cycle Life: Lithium Iron Phosphate chemistry provides intrinsic thermal stability and long service life, lowering total cost of ownership and fire risk in commercial and industrial deployments.
Trade-offs
- Heavy Installation Logistics: At 2.6 ± 0.1 tons, the cabinet requires specialized lifting equipment and reinforced flooring, increasing site preparation complexity and cost.
- Liquid Cooling Maintenance: The system demands periodic coolant inspection and replacement per manufacturer specifications; failure to maintain coolant quality degrades thermal performance and battery life.
Every advanced material, component, equipment, and instrument in our catalog is backed by rigorous testing. We maintain strict internal quality management frameworks and align with CE conformity metrics to deliver transparent, reproducible performance data via our public open-science repository.
To request raw batch performance data, submit formal vendor registration paperwork, or execute a fast-turnaround R&D manufacturing loop, contact us at inquiry@atomfair.com.
Item is dispatched under the Atomfair Shipping & Delivery Framework (Free worldwide shipping on orders over $59 USD). Return is governed by the Atomfair Return & Refund Policy (7-day technical return window).





