Description
3.95V Semi-Solid Battery 280Wh/kg 23Ah Series | ATOMFAIRCOMMERCIAL GRADE · PRODUCTION
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
TAILORED SOLUTIONS FOR RESEARCH
Contact our engineering team for technical support or official institutional quotations.
EMAIL: inquiry@atomfair.com
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Manufacturer: Atomfair LLC
Brand: ATOMFAIR®
|
Store cells in a cool, dry environment away from heat sources and open flames. Always use a compatible BMS and charge within the manufacturer's recommended voltage range to prevent over-discharge or over-current conditions.
- Temperature constraint: Avoid exposing cells to excessive temperatures for extended periods to prevent thermal degradation or runaway.
- Packaging requirement: Cells are shipped in moisture-barrier vacuum-sealed aluminum foil bags and must remain in such packaging until use.
- BMS requirement: A compatible Battery Management System with over-discharge, over-current, and cell balancing protection is mandatory.
- Pre-conditioning requirement: Pre-condition new cells at a suitable temperature before first use to ensure optimal performance and safety.
- Disposal regulation: Dispose of cells in accordance with local regulations to avoid environmental contamination.
Pre-condition new cells at a suitable temperature before first use. Connect a compatible BMS and charge within the recommended voltage range before deploying in a system.
Required Equipment: Battery Management System (BMS)
- Inspect packaging
Inspect the moisture-barrier vacuum-sealed packaging for any damage or punctures before opening. - Pre-condition cells
Pre-condition new cells at a suitable temperature for at least 2 hours before first use. - Connect BMS
Connect a compatible BMS with over-discharge, over-current, and cell balancing protection to the battery terminals. - Charge battery
Charge the battery within the manufacturer's recommended voltage range at a rate not exceeding 1C. - Monitor discharge
Monitor cell temperature during discharge and do not exceed the rated peak discharge duration of 10 seconds. - Dispose properly
Dispose of the battery in accordance with local regulations when end-of-life is reached.
How does the energy density vary across the 6S, 8S, 12S, and 18S configurations of the ATOMFAIR 3.95V Semi-Solid Battery series, and what trade-off exists between voltage and gravimetric energy density?
The energy density ranges from 265 Wh/kg (6S) to 280 Wh/kg (18S), with intermediate values of 270 Wh/kg for both 8S and 12S configurations. The trade-off is that higher voltage configurations (18S at 71.1V) achieve higher gravimetric energy density but require more series cells, increasing overall dimensions and weight (5900g vs 2050g for 6S). This allows system designers to prioritize either compactness or maximum energy per kilogram depending on application constraints.
What are the critical BMS requirements for integrating the ATOMFAIR 3.95V semi-solid battery into a drone or robotic system?
A compatible BMS must provide over-discharge protection, over-current protection, and cell balancing. The battery supports 1C charge, 5C continuous discharge, and 10C peak discharge, so the BMS must be rated for these current levels. Additionally, the cell voltage ranges from 23.7V (6S) to 71.1V (18S), requiring a BMS that matches the specific series configuration and can handle the nominal 3.95V per cell chemistry.
What storage and preconditioning procedures are required for the ATOMFAIR semi-solid electrolyte pouch cells to ensure safety and performance?
Cells are shipped in moisture-barrier vacuum-sealed aluminum foil bags and must be stored in anti-static cartons. Before first use, pre-condition new cells at a suitable temperature. Avoid exposing cells to excessive temperatures for extended periods. Do not exceed the rated peak discharge duration (10C). Always use a compatible BMS with over-discharge and over-current protection. Dispose of cells per local regulations.
The ATOMFAIR 3.95V Semi-Solid Battery Series (23Ah) achieves ultra-high energy density up to 280Wh/kg with semi-solid electrolyte technology, enabling compact lightweight energy storage for drones and robotics; it supports 1C charge, 5C continuous discharge, and 10C peak discharge across four series configurations (6S to 18S), but requires a compatible BMS and careful thermal management to maintain performance and safety.
Positive
- Ultra-High Energy Density: Energy density up to 280Wh/kg enables extreme lightweight design, ideal for UAVs, portable power stations, and high-density battery systems where weight and volume are critical.
- High Rate Capability: Supports 1C charge, 5C continuous discharge, and 10C peak discharge, providing stable power output for demanding applications such as robotics and electric equipment.
Trade-offs
- Requires Compatible BMS: Must be used with a BMS providing over-discharge, over-current, and cell balancing protection; failure to do so may compromise battery safety and cycle life.
- Environmental Sensitivity: Cells require pre-conditioning at suitable temperature before first use and must not be exposed to excessive temperatures for extended periods to avoid performance degradation.
Every advanced material, component, equipment, and instrument in our catalog is backed by rigorous testing. We maintain strict internal quality management frameworks and align with CE conformity metrics to deliver transparent, reproducible performance data via our public open-science repository.
To request raw batch performance data, submit formal vendor registration paperwork, or execute a fast-turnaround R&D manufacturing loop, contact us at inquiry@atomfair.com.
Item is dispatched under the Atomfair Shipping & Delivery Framework (Free worldwide shipping on orders over $59 USD). Return is governed by the Atomfair Return & Refund Policy (7-day technical return window).





